Now in closed beta.Book a demo to get started.
Use cases

Remove a compatibility layer once every user has moved

Tech debt and deprecations|The work pauses once the plan is written. Somebody reads the approach and approves it before any code exists, and the run continues from there.

A compatibility layer kept for users who have all since moved, removed on evidence rather than hope.

The ticket

Remove a compatibility shim after verifying every consumer has migrated.

Acceptance criteria

  • Every known consumer is verified as migrated
  • Usage evidence for the shim path is attached
  • The shim and its tests are removed together
  • The verification method is stated

What lands as proof

Usage evidence showing the shim path is cold, plus a per-consumer check.

Why teams defer it

  • Nobody is certain every consumer moved, and being wrong breaks somebody else's system.
  • The shim costs nothing visible, so removing it is all risk and no reward for whoever approves it.

Questions

What does the agent actually change?
The ticket is scoped to one outcome: remove a compatibility shim after verifying every consumer has migrated. Work that serves that outcome is in scope, and anything outside it is left for a separate ticket, so the pull request stays reviewable.
How do I know the work is done?
The pull request carries the evidence, not only the diff. Here that means consumers verified in the description, the shim deleted, so a reviewer can confirm the result without reproducing the work locally.
How much oversight does this need?
The run stops once the plan is written. Somebody reads the approach and approves it before any code exists, which is the cheapest moment to redirect the work.

Ready to put the fleet to work?

Contact us for a demo with an expert.